CAPITAL

1. BOT: Construction-Operation-Transfer

Party A is responsible for providing stable gas sources, such as natural gas, biogas and other methane-containing gases. Lister Petter will be responsible for the construction and operation of the project, and the project will be handed over to Party A after the contractual period.

2. BT: Construction-handover

Party A is responsible for providing a stable gas source, Lister Petter will be responsible for the investment and construction of the project, and the hand over will be in accordance with the agreed amount in the contract between the two parties.

3. BOO: Construction-Operation

Lister Petter is responsible for the project investment, construction and operation. The ownership of the project belongs to Lister Petter which promise to provide customers with a stable supply of cold, heat and electric power source. The customer will have to pay the energy fee according to the contract.

Lister Petter provides system solutions proposal with diesel generator and gas generator sets according to customer needs. The customer will pay the rental fee on a monthly basis according to the contract. After the contract expires, the property right of the generator set belongs to Party A.

1. Business model

1) Energy-saving renovation project for existing buildings
2) Project in upgrading the energy efficiency for new buildings
3) New construction project EPC + third-party operation

2. Customer benefits

1) Energy-saving renovation project for existing buildings
The introduction of energy services for the third party in which the owner will need no investment fund or just partial funding requirement for the construction of the energy system and that the fund can be better utilized for their own business development purpose.

2)Obtain a highly efficient and stable energy system
The profit source and the main driving force of employing third-party energy services is the reduction of operating costs brought by the construction of the highly efficient energy systems

3)Lock in energy expenditure during the cooperation period
Avoid and separate from the uncertainty of energy cost under the convention mode of design-procurement-build-operation style. The energy cost after energy management provides a clear cut financial data and is controllable which is convenient for financial management and the realization of the goal for energy cost.

4)Mutual energy-saving benefits
During the cooperation period, the owner can have access to lower energy costs and after the expiry of the contract can obtain a more efficient and energy-saving system

5)With continuous energy efficiency optimization
Through the in-depth systematic management of energy data from the third-party energy service companies, lean energy efficiency management is being realized and that the optimization of energy efficiency is in continuance during the contractual period

6)Transfer of Operational Risk
Through the hosting service that all the maintenance, repair and operation of the energy system are the responsibility of the energy company which can greatly reduce the risk of the operating process by the owner.